Geometry Optimization and Cost Reduction

Same function, lower cost.

Much of a part's cost is decided by its geometry, long before production. We find what makes it expensive without adding function and deliver a solution your team can apply.

Quote-basedFixed scopeUpdated CAD when applicable
A part that works but costs more than it should
Fig. 1 · The service in under a minute
Engineering cases

Same function, simpler tooling.

Two examples of how a small change in geometry replaces a special process with a standard one. Drag to compare.

Snap-fit hook without a side action

The underside of the hook is trapped in the mold and forces a side action or lifter. Opening a window in the wall right below the hook lets a core on the moving half form that face and release straight in the mold-opening direction.

  • 15 to 30%is what side actions typically add to the cost of a mold
  • 2 platesa simpler mold, with no moving components to maintain
  • 3°minimum draft on the shut-off faces, so the mold does not wear

Illustrative examples based on published design guidelines for injection molding (Protolabs) and CNC machining. The gain of each change is estimated on your project before you decide.

Where the cost is

Six levers we analyze on every part.

A part can work well and still carry unnecessary cost, complexity or dependence on a single supplier.

01 · Features

Simpler geometry

Radii, counterbores and holes that cost machine time and do not change the function.

02 · Tolerances

Tolerances where function needs them

Opening what is not critical removes rework, inspection and scrap.

03 · Process

Geometry for the right process

Draft, wall thickness and tool access aligned with molding, machining or stamping.

04 · Material

Material and treatment

Sometimes the saving is in the material or the finish, not in the shape.

05 · Assembly

Simpler assembly (DFMA)

Fewer fasteners, fewer operations, and features that only assemble one way.

06 · Inspection

Easy to measure

Requirements your supplier can verify with the equipment it already has.

Deliverables

You get the solution, not just a list of problems.

Optimized geometryFewer operationsStandard toolingSame function
Optimization report0/5
  • Prioritized opportunitiesranked by impact and effort
  • Technical rationalefor every change and the risk involved
  • Updated CAD modelwhen the solution is geometric
    .STP
  • Material, process and tolerancesrecommendations where applicable
  • A basis for your decisionyour engineering team validates and releases
When it makes sense

Signs that a part could cost less.

Cost

The quote came in too high

The price does not match how complex the part ought to be.

Assembly

Slow or difficult assembly

The line complains, the part fits more than one way or needs adjusting.

Supplier

Only one supplier can make it

The geometry depends on a specific process or machine.

Quality

Recurring problems

Rejections, rework or deviations that come back with every lot.

For your quote

What to send.

Beyond the basics, the current part cost and any quotes you already have help a lot with optimization.

Quote package0/6
  • STEP assembly with the part and its mating parts
    .STP
  • Material, manufacturing process and assembly sequence
  • Part function and critical characteristics
  • Estimated annual production volume
  • Current cost, quotes received or target saving
  • History of manufacturing or assembly issues
Ready to quote
Frequently asked questions

About optimization.

If the part already works, why change it?
A part can work and still carry cost, complexity or supplier dependence. The goal is not to change what works, but to show where it can be made cheaper and with less risk while keeping its function.
Do you redesign the whole product?
No. We work part by part, or on assemblies defined in the scope. Final decisions, validation and release stay with your engineering team.
Are your recommendations ready to send to production?
They are engineering recommendations for your team to evaluate. Your engineers validate each change, update the released documentation and remain responsible for the product. That is how we keep the decision where it belongs.
How is the price set?
By scope: number of parts, complexity and depth of analysis. You receive a fixed price, in USD or EUR, before you approve.
Do you guarantee a percentage of savings?
We do not promise a percentage before analyzing the part. The report shows each opportunity with its expected impact, so you can decide what to apply.

Which part is costing too much?

Send the assembly and the basic information. We come back with scope, price and lead time.